Copy From a Previous Study
Need to reuse a proven survey structure? Start a new study from a questionnaire you've already built.
How to copy a previous study
- Click New Study in the top navigation.
- Under Start with, select Previous study (Reuse an existing questionnaire).
- Choose the study you want to reuse. Switch between My studies and All studies, search by name, or group the list by category. Select a study to preview its questions before you create the new one.
- Create the study. The new study opens on the Build step, ready to edit.

Only the questionnaire is copied. Responses from the original study are not included.
Use this to speed up setup, keep trackers consistent across waves and scale best practices across your team.